Rajendra Agarwal And Associates ‘A’ Class Civil Contractors & Engineers are Registered Partnership Firm, engaged in construction work established in the year of 1985 having its registered address at 174/9,Likhdhari Guest House Campus, Jail Crossing, Jhansi (U.P) Pin: 284135 with Branch Office Sarandhra Nagar Hansari Jhansi UP and MP office at 31-32 Pratap pura Industrial Area Orchha, Niwari MP 472246.
Lowering and heightening of existing girders refers to the process of adjusting the vertical position of a girder (a structural beam) after it has been installed. This might be necessary to accommodate changes in the structure, correct for errors, or meet new design requirements.
Lowering a Girder:
Structural Assessment:
A thorough analysis is needed to determine the feasibility and methods for lowering the girder without compromising its structural integrity or the stability of connected elements.
Support System:
A temporary support system, such as jacks and temporary beams, is installed to bear the girder's weight during the lowering process.
Controlled Descent:
The girder is carefully lowered in a controlled manner using the support system, ensuring uniform movement and preventing stress concentrations.
Re-establishment of Connections:
Once the girder is at the desired height, connections to adjacent structural elements are re-established, and the temporary support system is removed.
Heightening a Girder:
Structural Assessment:
Similar to lowering, a detailed assessment is required to determine the impact of heightening on the overall structure.
Temporary Supports:
Temporary supports are installed to hold the girder in its current position while modifications are made.
Girder Modification:
This may involve adding a section to the girder (e.g., a steel plate or concrete extension) or modifying the connection points. In some cases, the entire girder might be replaced with a taller one.
Re-establishment of Connections:
The modified girder is then reconnected to the structure, and the temporary supports are removed.